Damodar Ropeways & Infra Limited.

BHUTAN

Design & Engineering, Supply, Testing & Supervision of erection installation of Ropeway over Barsa River was undertaken for the Bhutan Carbide & Chemicals Limited, Bhutan. It was a challenging project as a river needed to be crossed, however the same was done with immaculate planning and execution by our experienced engineers.

SYSTEM :                                      Single Jigback

SPEED :                                          0.5 m/s

MATERIAL SIZE :                          25 mm

SPEED :                                          4m / Sec. nominal

PAYLOAD :                                      200 Kg [Maximum]

NO. OF BUCKETS :                        1

Scroll to Top