PROJECTS
Menu
BHUTAN
Design & Engineering, Supply, Testing & Supervision of erection installation of Ropeway over Barsa River was undertaken for the Bhutan Carbide & Chemicals Limited, Bhutan. It was a challenging project as a river needed to be crossed, however the same was done with immaculate planning and execution by our experienced engineers.
SYSTEM : Single Jigback
SPEED : 0.5 m/s
MATERIAL SIZE : 25 mm
SPEED : 4m / Sec. nominal
PAYLOAD : 200 Kg [Maximum]
NO. OF BUCKETS : 1